COMPANY NEWS
Hilton Hotel, Canary Wharf,
London
Wiremek recently resigned,
manufactured, installed and commissioned:-
4 x 11000v - 400v packaged
sub-stations, Main LV distribution boards, Sub-distribution
boards and dual voltage room distribution boards throughout
the hotel.
Restriction in space was
overcome using Wiremek's adaptable panel system which can
incorporate and make/typre of switching

85 Fleet Street, London - Former
Reuters News
Refurished in 2006/2007, Wiremek
were responsible for designing, manufacturing, installing
and commisioning:-
2 x 11000v - 400v packaged
sub-stations, main LV distribution, Mains/generator auto
controls and sub-distribution via rising busbar.
Design, manufacture, install and
commission a heating and ventilation control system.
Wiremek achieved control by the
installation of a Cylon Building Energy Management System,
controlling heating and ventilation system and monitoring
all systems throughout the building with the inclusion of
back up generator in 2008.
We are also carrying out the
maintenance of the heating and ventilation controls and high
voltage/low voltage switchgear.

Tower Hamlets Mile End Hospital,
London
Starting in 1997 Wiremek
modified the exisiting Heating and Ventilation control
system by the integration of a front end controlled Building
Energy Management System.
Over a number of years the steam
plant been replaced with individual gas fired heating
systems.
The BEMS required additions and
modifications - the largest being the addition of a new
Mental Health Unit.
Wiremek also carry out controls
maintenance and attend breakdowns as and when required.
There is also plans for a new
Education Block scheduled for 2008 to be added to the
system.

Willis Group, Ipswich
Having carried out maintenace of
the Main low voltage switchgear for a number of years, in
2007 Wiremek were involved in the design, manufacture,
installation and commissioning of replacement Main low
voltage panels.
As a listed building the
switchgear had to fit the space created by the removal of
existing and be visually the same.
The replacement extends to the
four riser cores with a panel on each floor manufactured,
installed and commissioned on weekend shutdowns for minimum
disruption.
|